Welcome to the XSol Diagnostic System
This system provides interactive diagnostic tests with proper sequence navigation based on the decoded .seq file logic.
IDEAL STELRAD SPRINT 90 NF
G.C. NUMBER 47 415 0
CH BURNER MODULATION
PRE-HEAT SWITCH OFF<
CENTRAL HEATING OPERATION
PRE-HEAT SWITCH OFF<
PRE-HEAT CYCLE COMPLETED
CH SWITCH OFF
ENS
DHW BURNER MODULATION
PRE-HEAT SWITCH OFF<
DHW OPERATION
PRE-HEAT SWITCH OFF
DHW TEMPERATURE SET TO MAXIMUM POSITION
CH BURNER IGNITES (FAN SPEED HIGH THEN LOW)
PRE-HEAT SWITCH OFF
CH SWITCH ON
DIVERTER VALVE ENERGISED (CH DEMAND)
REMOVE METAL TOP COVER FROM DIVERTER VALVE
PRE-HEAT SWITCH OFF
DHW MAXIMUM PRESSURE
PRE-HEAT SWITCH OFF
ATTACH U-GAUGE TO BURNER PRESSURE TEST POINT
BURNER IGNITES (PRE-HEAT)
CH SWITCH OFF
ENS
PILOT IGNITES (PRE-HEAT)
CH SWITCH OFF
ENS
FAN RUNS (PRE-HEAT)
CH SWITCH OFF
ENS
PUMP RUNS (PRE-HEAT)
CH SWITCH OFF
ENS
DHW FLOW SWITCH (OPERATION)
ELECTRICALLY DISCONN
SYSTEM CHECKS
PLEASE ENSURE ALL THE FOLLOWING SYSTEM CHECKS ARE COMPLETED
ELECTRICAL SAFETY CHECKS
BOILER DISCONNECTED FROM MAINS SUPPLY.
SYSTEM PRESSURE RISE
PRE-HEAT SWITCH OFF
CH TEMPERATURE SET TO MAXIMUM POSITION
BURNER IGNITES
PCB 23
BURNER IGNITES
ELECTRODE AND LEAD (SENSE)
MAIN SOLENOID RESISTANCE
GAS VALVE
BURNER PRESSURE
GAS VALVE
DIVERTER VALVE ENERGISED
CH SWITCH
DIVERTER VALVE ENERGISED
DIVERTER VALVE HEAD
CH BURNER IGNITES
CH SENSOR
CH BURNER IGNITES
AIR PRESSURE SWITCH TUBES
CH BURNER IGNITES
HOOD ASSEMBLY (AIR PRESSURE SENSING TUBE)
CH BURNER IGNITES
FAN (VENTURI)
DHW OPERATION
PRIMARY HEAT EXCHANGER
DHW OPERATION
PCB 23
DHW OPERATION
DIVERTER VALVE HEAD
DHW BURNER MODULATION
DHW SENSOR
POTENTIOMETER ASSEMBLY (DHW)
POTENTIOMETER ASSEMBLY (DHW)
PRE-HEAT CYCLE COMPLETED
DIVERTER VALVE HEAD
PRE-HEAT CYCLE COMPLETED
PCB 23
ELECTRICAL SAFETY CHECKS
ELECTRICAL CHECKS
SYSTEM PRESSURE RISE
EXPANSION VESSEL
CH OPERATION
CH SENSOR
DHW OK, CH QUIET, RADIATORS COOL, BURNER PRESSURE OK
DIVERTER VALVE
SYSTEM CHECKS
SYSTEM CHECKS
DHW FLOW RATE
DHW FLOW ADJUSTER
DHW FLOW RATE
DHW INLET FILTER
CH BURNER MODULATION
POTENTIOMETER ASSEMBLY (CH)
CH BURNER MODULATION
CH SENSOR
DHW FLOW SWITCH
DHW FLOW SWITCH
PUMP RUNS
FUSE
PUMP RUNS
PRE-HEAT THERMOSTAT
PUMP RUNS
DRY FIRE THERMOSTAT
PUMP VOLTAGE
PCB 23
FAN RUNS
AIR PRESSURE SWITCH TUBES
FAN RUNS
FAN (VENTURI)
FAN RUNS
DHW SENSOR
FAN RUNS
PCB 23
FAN RUNS
CH OVERHEAT THERMOSTAT
FAN VOLTAGE
PCB 22
AIR PRESSURE SWITCH VOLTAGE
PCB 22
PILOT IGNITES
AIR PRESSURE SWITCH TUBES
PILOT IGNITES
FLUE
PILOT IGNITES
FAN (VENTURI)
SPARK GENERATOR OUTPUT
PCB 22
PILOT IGNITES
PILOT INJECTOR
SPARK PRESENT AT ELECTRODE BUT NO IGNITION
ELECTRODE AND LEAD (SPARK)
DHW MAXIMUM PRESSURE
DHW SENSOR
BURNER IGNITES
PCB 22
BURNER IGNITES
BURNER INJECTOR
DIVERTER VALVE ENERGISED
DIVERTER VALVE MOTOR
FAN RUNS HIGH SPEED ONLY
PCB 23
CH SENSOR RESISTANCE
PCB 23
CH BURNER IGNITES
AIR PRESSURE SWITCH
DHW QUIET OPERATION, RADIATORS REMAIN COLD
SECONDARY HEAT EXCHANGER
DHW PRIMARY HEAT EXCHANGER NOISY (KETTLING)
SECONDARY HEAT EXCHANGER
DHW BURNER MODULATION
GAS VALVE
DHW BURNER MODULATION
PCB 23
PRE-HEAT CYCLE COMPLETED
PRE-HEAT THERMOSTAT
PRE-HEAT CYCLE COMPLETED
DIVERTER VALVE
DHW OK, CH FLOW PIPE DOES NOT HEAT UP
DIVERTER VALVE
CH OPERATION
PCB 23
DHW OPERATION
DIVERTER VALVE
DHW FLOW RATE
SECONDARY HEAT EXCHANGER (SCALED)
CH BURNER MODULATION
PCB 23
PUMP RUNS
PRE-HEAT SWITCH
PUMP RUNS
PUMP
FAN RUNS
AIR PRESSURE SWITCH
PCB 23 RELAY 'C' OPERATION
PCB 22
FAN RUNS
DHW OVERHEAT THERMOSTAT
FAN RUNS
FAN
PILOT IGNITES
AIR PRESSURE SWITCH
NO SPARK PRESENT AT ELECTRODE
ELECTRODE AND LEAD (SPARK)
DHW MAXIMUM PRESSURE
GAS VALVE
FAN DOES NOT RUN
CHARACTERISTIC TEST FROM CH BURNER IGNITES (FAN SPEED HIGH THEN LOW)
FAN RUNS HIGH SPEED ONLY
CHARACTERISTIC TEST FROM CH BURNER IGNITES (FAN SPEED HIGH THEN LOW)
FAN RUNS HIGH SPEED, THEN LOW SPEED, BURNER CYCLES ON AND OFF
CHARACTERISTIC TEST FROM CH BURNER IGNITES (FAN SPEED HIGH THEN LOW)
DHW OPERATION PRIMARY HEAT EXCHANGER NOISY (KETTLING)
CHARACTERISTIC TEST FROM DHW OPERATION
DHW QUIET OPERATION, RADIATORS REMAIN COLD
CHARACTERISTIC TEST FROM DHW OPERATION
DHW QUIET OPERATION, RADIATORS WARM
CHARACTERISTIC TEST FROM DHW OPERATION
CH PRIMARY HEAT EXCHANGER NOISY, DHW OK
CHARACTERISTIC TEST FROM CH OPERATION (ACC)
DHW OK, CH FLOW PIPE DOES NOT HEAT UP
CHARACTERISTIC TEST FROM CH OPERATION (ACC)
DHW OK, CH QUIET, RADIATORS COOL, BURNER PRESSURE INCORRECT
CHARACTERISTIC TEST FROM CH OPERATION (ACC)
DHW OK, CH QUIET, RADIATORS COOL, BURNER PRESSURE CORRECT
CHARACTERISTIC TEST FROM CH OPERATION (ACC)
NO SPARK PRESENT AT THE ELECTRODE
CHARACTERISTIC TEST FROM PILOT IGNITES (PRE-HEAT)
SPARK PRESENT AT ELECTRODE, BUT NO IGNITION
CHARACTERISTIC TEST FROM PILOT IGNITES (PRE-HEAT)
MAIN BURNER IGNITES, BURNER PRESSURE TOO HIGH
CHARACTERISTIC TEST FROM BURNER IGNITES (PRE-HEAT)
MAIN BURNER DOES NOT IGNITE
CHARACTERISTIC TEST FROM BURNER IGNITES (PRE-HEAT)
22/04/2010 10:38:59 1_0_1 23/04/2010 12:51:22
23/04/2010 09:35:52
PCB 23 RELAY A OPERATION
CH SWITCH ON
EXTERNAL CONTROLS 1 VOLTAGE (OUTPUT)
PRE-HEAT SWITCH OFF
EXTERNAL CONTROLS (I.E. ROOM THERMOSTAT/PROGRAMMER) CALLING
CH SWITCH ON
CH SWITCH (RESISTANCE)
REMOVE YELLOW WIRES FROM CH SWITCH
CH SWITCH ON
EXTERNAL CONTROLS 2 RESISTANCE (ROOM THERMOSTAT)
EXTERNAL CONTROLS (I.E. ROOM THERMOSTAT/PROGRAMMER) CALLING
PRE-HEAT SWITCH OFF
CH SWITCH ON
DHW MODULATION VOLTAGE
DHW TEMPERATURE SET TO MAXIMUM POSITION
FLOW RATE AT TAP SET TO APPROX 7 LTR/MIN
DHW SENSOR RESISTANCE (MODULATION)
SET FLOW RATE AT TAP TO APPROXIMATELY 7 LTR/MIN
DIVERTER VALVE LETTING BY
ROOM THERMOSTAT CALLING (IF FITTED)
CH SWITCH IN OFF POSITION
DHW FLOW RATE ADJUSTER
(ENSURE HOT TAP IS FULLY ON)
CH POTENTIOMETER RESISTANCE
DISCONNECT CONNECTOR MARKED M1/M7 FROM MAIN PCB 23
PRE-HEAT THERMOSTAT VOLTAGE (OUTPUT)
ENSURE SECONDARY HEA
PRE-HEAT SWITCH VOLTAGE (INPUT)
ENSURE SECONDARY HEA
FUSE RESISTANCE
REMOVE FUSE FROM MAIN PCB 23 (LOCATED BELOW TERMINAL STRIP TOWARDS THE R/H SIDE OF THE PCB)
AIR PRESSURE SWITCH (NC RESISTANCE)
DISCONNECT RED LEAD FROM THE AIR PRESSURE SWITCH
DHW SENSOR RESISTANCE (DEMAND)
ENSURE DHW IS COOL (
CH OVERHEAT THERMOSTAT (RESISTANCE)
REMOVE VIOLET SPADED WIRES FROM CH OVERHEAT THERMOSTAT
AIR PRESSURE SWITCH VOLTAGE (COM)
ENSURE SECONDARY HEA
DHW MODUREG FULL VOLTAGE
ENSURE DHW IS COOL (
DHW SENSOR RESISTANCE (FULL DEMAND)
ENSURE DHW IS COOL (
MAIN SOLENOID VOLTAGE (GV2)
CH SWITCH OFF
ENS
MAIN SOLENOID RESISTANCE (GV2)
REMOVE GREY PLASTIC
BURNER PRESSURE (IGNITION)
CH SWITCH OFF
ENS
DIVERTER VALVE VOLTAGE (INPUT)
PRE-HEAT SWITCH OFF
CH SWITCH ON
EXTERNAL CONTROLS 1 VOLTAGE (INPUT)
PRE-HEAT SWITCH OFF
DIVERTER VALVE (GEARING MOVES FREELY)
REMOVE THE METAL TOP COVER OF THE DIVERTER VALVE
CH SENSOR RESISTANCE (DEMAND)
ENSURE BOILER IS NOT
FAN VOLTAGE (LOW SPEED)
PRE-HEAT SWITCH OFF
CH SWITCH ON
FAN MOTOR RESISTANCE (LOW SPEED)
DISCONNECT 12 PIN CONNECTOR MARKED D18 TO D29 (TOP L/H SIDE) FROM MAIN PCB 23
PCB 23 (DIVERTER VALVE VOLTAGE FAULT)
PRE-HEAT SWITCH ON
CH SWITCH OFF
DHW POTENTIOMETER RESISTANCE
DISCONNECT CONNECTOR MARKED M1/M7 FROM MAIN PCB 23
PCB 23 (DIVERTER VALVE VOLTAGE FAULT)
PRE-HEAT SWITCH ON
CH SWITCH OFF
CH SENSOR RESISTANCE (FULL DEMAND)
DISCONNECT PLUG FROM
DIVERTER VALVE FULLY OPEN (CH DEMAND)
PRE-HEAT SWITCH OFF
REMOVE METAL TOP COVER FROM THE DIVERTER VALVE
DHW INLINE FILTER
COLD WATER OFF
AIR PRESSURE SWITCH VOLTAGE (AIR DETECT)
ENSURE SECONDARY HEA
PILOT SOLENOID RESISTANCE (GV1)
REMOVE PLUG FROM PILOT SOLENOID (SECURED BY 1 CENTRAL SCREW)
CH SENSOR RESISTANCE (MODULATION)
PRE-HEAT SWITCH OFF
CH SWITCH ON
CH TEMPERATURE SELECTOR TO MAXIMUM POSITION
DRY FIRE THERMOSTAT (RESISTANCE)
REMOVE SPADED RED WI
PRE-HEAT THERMOSTAT RESISTANCE
ENSURE SECONDARY HEA
PUMP VOLTAGE
ENSURE SECONDARY HEA
AIR PRESSURE SWITCH (VOLTAGE NC)
CH SWITCH OFF
ENS
CH OVERHEAT THERMOSTAT VOLTAGE (OUTPUT)
CH SWITCH OFF
ENS
PCB 23 RELAY 'C' OPERATION (VOLTAGE)
UNPLUG IGNITION PCB
FAN VOLTAGE (HIGH SPEED)
CH SWITCH OFF
ENS
SPARK GENERATOR OUTPUT
ENSURE SECONDARY HEA
PILOT SOLENOID VOLTAGE (GV1)
ENSURE SECONDARY HEA
MODULATION VOLTAGE (FAULT)
CH SWITCH OFF
ENS
System Information
- Total Tests: 182
- Sequence Logic: Decoded from encrypted .seq file
- Navigation: Dynamic based on pass/fail results
- Source: 4731307 GW SWIFTFLOW 100 SIT Control