Set Appliance State:

Mains Power Off
Gas Off
Set Multimeter to AC Volts Set meter to measure AC Volts
CH switch OFF
Ensure secondary heat exchanger is cool and requires pre-heat (this can be achieved by running the DHW with the gas to the appliance turned off)
Mains Power On

Measurement:

Pre-heat switch ON.
Measure voltage across NC terminal (violet wire) of air pressure switch and neutral (blue wire) on main connector block.