Set Appliance State:
Mains Power Off
Gas Off
Ensure secondary heat exchanger is cool and requires pre-heat (this can be achieved by running the DHW with the gas to the appliance turned off)
CH switch OFF
CH switch OFF
Mains Power On
Measurement:
Pre-heat switch ON.
Allow fan to run.
Measure voltage across the NO terminal (yellow wire) on the air pressure switch and neutral (blue wire) on the main connector block.
Allow fan to run.
Measure voltage across the NO terminal (yellow wire) on the air pressure switch and neutral (blue wire) on the main connector block.

Isolate as per TOPs P4
and refit as necessary