Welcome to the XSol Diagnostic System
This system provides interactive diagnostic tests with proper sequence navigation based on the decoded .seq file logic.
IDEAL CLASSIC NF 80
G.C. NUMBER 47 415 0
HOT WATER
CH/HW SWITCH IN HW POSITION
CENTRAL HEATING OPERATION
CH/HW SWITCH IN CH POSITION
BOILER ON/OFF SWITCH ON
ENSURE BOILER NOT IN PRE-HEAT MODE
DHW MAIN BURNER PRESSURE
{ISOLATEMAINSPOWER}<
DHW MAIN BURNER IGNITES
CH/HW SWITCH IN HW POSITION
ON/OFF SWITCH TO ON
DIVERTER VALVE DE-ENERGIZED
CH/HW SELECTOR SWITCH IN HW POSITION.
DHW FLOW RATE
{ISOLATEMAINSPOWER}
CH MAIN BURNER PRESSURE
{ISOLATEMAINSPOWER}<
CH MAIN BURNER IGNITES
CH/HW SWITCH IN CH POSITION
ON/OFF SWITCH ON
ENSURE BOILER NOT IN PRE-HEAT MODE
DIVERTER VALVE OPERATION (ENERGIZED)
CH/HW SWITCH IN CH POSITION
ENSURE BOILER IS NOT IN PRE-HEAT MODE
CH PUMP RUNS
CH/HW SWITCH IN CH POSITION
ENSURE BOILER NOT IN PRE-HEAT MODE
PRE-HEAT CYCLE COMPLETE
CH/HW SWITCH IN HW POSITION
ENSURE BOILER IS IN PRE-HEAT MODE
BOILER SWITCH IN ON POSITION
BURNER IGNITES (PRE-HEAT)
CH/HW SWITCH IN HW P
FAN RUNS (PRE-HEAT)
CH/HW SWITCH IN HW P
MAINS NEON I 3 (PRE-HEAT)
{ISOLATEMAINSPOWER}<
PUMP RUNS (PRE-HEAT)
CH/HW SWITCH IN HW P
SYSTEM CHECK
{ISOLATEMAINSPOWER}
PLEASE ENSURE THE FOLLOWING SYSTEM CHECKS ARE COMPLETED
IDEAL CLASSIC NF 80
{ISOLATEMAINSPOWER}<
PILOT IGNITES (PRE-HEAT)
CH/HW SWITCH IN HW P
CH MAIN BURNER IGNITES
THERMOSTAT - HIGH SETTING ELMWOOD SENSORS
CH MAIN BURNER PRESSURE
PCB 27 - PACTROL NO 27
CH MAIN BURNER PRESSURE
GV3 COIL
DHW FLOW RATE
DHW FILTER
DHW FLOW RATE
STRAINER
DIVERTER VALVE DE-ENERGIZED
DIVERTER VALVE SUB - ASSEMBLY 3 WAY
DHW MAIN BURNER IGNITES
FLOW SWITCH SUB ASSEMBLY C/W FLOW SWITCH
DHW MAIN BURNER PRESSURE
THERMOSTAT - DHW - ELMWOOD
CENTRAL HEATING OPERATION
WAX THERMOSTAT ASSEMBLY
CENTRAL HEATING OPERATION
DIVERTER VALVE SUB - ASSEMBLY 3 WAY
HOT WATER
STRAINER
HOT WATER
THERMOSTAT - DHW - ELMWOOD
FAN RUNS (PRE-HEAT)
KIT - ON/OFF C/W ROCKER SWITCH
FAN IMPELLER
PCB 25E - PACTROL
PILOT IGNITES (PRE-HEAT)
KIT - PRESSURE SENSING TUBES
PILOT IGNITES (PRE-HEAT) (FAIL)
PCB 25E - PACTROL
PILOT IGNITES (PRE-HEAT)
GV1 COIL
PILOT IGNITES (PRE-HEAT)
KIT - INJECTOR - PILOT BURNER
PILOT IGNITES (PRE-HEAT)
ELECTRODE - IGNITION C/W LEAD
ELECTRICAL CHECK
ELECTRICAL CHECK
SYSTEM CHECK
SYSTEM CHECK
PUMP RUNS (PRE-HEAT)
THERMOSTAT - HIGH SETTING ELMWOOD SENSORS
PUMP RUNS (PRE-HEAT)
DHW PRE-HEAT THERMOSTAT
PUMP VOLTAGE (PRE-HEAT)
PCB 27 - PACTROL NO 27
MAINS NEON I 3 (PRE-HEAT)
THERMOSTAT - OVERHEAT - RANCO
MAINS NEON I 3 (PRE-HEAT)
PCB 27 - PACTROL NO 27
FAN RUNS (PRE-HEAT)
FUSE: PCB NO.26
FAN RUNS (PRE-HEAT)
PRESSURE SWITCH
FAN RUNS (PRE-HEAT)
KIT - PRESSURE SENSING TUBES
FAN RUNS (PRE-HEAT)
FAN ASSEMBLY (IMPELLER)
BURNER IGNITES (PRE-HEAT)
ELECTRODE - IGNITION C/W LEAD
BURNER IGNITES (PRE-HEAT)
GV2 COIL (MAIN GAS VALVE SOLENOID)
BURNER IGNITES (PRE-HEAT)
MAIN GAS VALVE
PRE-HEAT CYCLE COMPLETE
FLOW SWITCH SUB ASSEMBLY C/W FLOW SWITCH
CH PUMP RUNS
CH/HW SWITCH
DIVERTER VALVE OPERATION (ENERGIZED)
PCB 27 - PACTROL NO 27
CH MAIN BURNER IGNITES
PCB 27 - PACTROL NO 27
CH MAIN BURNER PRESSURE
GAS VALVE (GV3)
DHW FLOW RATE
CALORIFIER
DHW MAIN BURNER PRESSURE
PCB 27 - PACTROL NO 27
CENTRAL HEATING OPERATION
EXPANSION VESSEL
CENTRAL HEATING OPERATION
HEAT EXCHANGER ASSEMBLY
HOT WATER
DIVERTER VALVE SUB - ASSEMBLY 3 WAY
HOT WATER
CALORIFIER
HOT WATER
GAS VALVE (GV3)
PCB 26: FUSE
PCB 25E - PACTROL
PILOT IGNITES (PRE-HEAT)
PRESSURE SWITCH
PILOT IGNITES (PRE-HEAT) (PASS)
PCB 25E - PACTROL
PILOT IGNITES (PRE-HEAT)
PCB 25E - PACTROL
PUMP RUNS (PRE-HEAT)
FUSE: PCB NO.27
CH SWITCH VOLTAGE
PCB 27 - PACTROL NO 27
DHW PRE-HEAT THERMOSTAT
PCB 27 - PACTROL NO 27
PUMP RUNS (PRE-HEAT)
PUMP
MAINS NEON I 3 (PRE-HEAT)
PCB 25E - PACTROL
AIR PRESSURE SWITCH: NO AIR RESISTANCE
PCB 25E - PACTROL
FAN RUNS (PRE-HEAT)
FAN ASSEMBLY
BURNER IGNITES (PRE-HEAT)
PCB 25E - PACTROL
BURNER IGNITES (PRE-HEAT)
INJECTOR - BURNER - BRAY
PRE-HEAT CYCLE COMPLETE
DHW PRE-HEAT THERMOSTAT
CH PUMP RUNS
PCB 27 - PACTROL NO 27
DIVERTER VALVE OPERATION (ENERGIZED)
DIVERTER VALVE SUB - ASSEMBLY 3 WAY
EXCESSIVE PRESSURE RISE IN SYSTEM DURING OPERATION
CHARACTERISTIC TEST FROM CENTRAL HEATING OPERATION
NOISY OPERATION (HEAT EXCHANGER NOISY)
CHARACTERISTIC TEST FROM CENTRAL HEATING OPERATION
QUIET OPERATION, CORRECT SYSTEM PRESSURE
CHARACTERISTIC TEST FROM CENTRAL HEATING OPERATION
COLD RADIATORS
CHARACTERISTIC TEST FROM HOT WATER
WARM RADIATORS
CHARACTERISTIC TEST FROM HOT WATER
HOT WATER TOO HOT
CHARACTERISTIC TEST FROM HOT WATER
06/02/2018 11:26:14 1802_1_50_1 06/03/2018 13:49:23
07/02/2018 08:47:22
GAS VALVE 3 VOLTAGE (CH DEMAND)
{ISOLATEMAINSPOWER}<
DHW INLET FILTER
{ISOLATEMAINSPOWER}
MAINS WATER OFF
DHW CONTROL THERMOSTAT
{ISOLATEMAINSPOWER}
ENSURE THE BOILER IS NOT AT ITS FULL OPERATING TEMPERATURE
SPARK GENERATOR (PRE-HEAT)
{ISOLATEMAINSPOWER}<
AIR PRESSURE SWITCH: AIR DETECT (PRE-HEAT)
CH/HW SWITCH IN HW P
DHW OVERHEAT THERMOSTAT VOLTAGE (PRE-HEAT)
{ISOLATEMAINSPOWER}<
CH SWITCH VOLTAGE
{ISOLATEMAINSPOWER}<
MAINS POWER SUPPLY
CH/HW SWITCH IN HW POSITION
DHW PRE-HEAT THERMOSTAT
{ISOLATEMAINSPOWER}
CH OVERHEAT THERMOSTAT
{ISOLATEMAINSPOWER}<
PCB 26 RELAY RLA OPERATION (PRE-HEAT)
{ISOLATEMAINSPOWER}<
PCB 26 RELAY RLB OPERATION (PRE-HEAT)
CH/HW SWITCH IN HW P
PCB 26: FUSE
{ISOLATEMAINSPOWER}
GAS VALVE 2 VOLTAGE (PRE-HEAT)
CH/HW SWITCH IN HW P
ELECTRODE AND LEAD CHECK
{ISOLATEMAINSPOWER}<
DHW FLOW SWITCH (STUCK OPEN)
{ISOLATEMAINSPOWER}
GAIN ACCESS TO PCB (USE INSULATION MAT AS REQUIRED)
CH SWITCH VOLTAGE
{ISOLATEMAINSPOWER}<
DIVERTER VALVE MOTOR VOLTAGE
{ISOLATEMAINSPOWER}<
CH CONTROL THERMOSTAT
{ISOLATEMAINSPOWER}
ENSURE THAT THE BOILER IS NOT AT ITS FULL OPERATING TEMPERATURE
GAS VALVE 3 COIL RESISTANCE
{ISOLATEMAINSPOWER}
DHW FLOW ADJUSTER
{ISOLATEMAINSPOWER}
CH THERMOSTATIC VALVE
CH/HW SWITCH IN CH POSITION
BOILER ON/OFF SWITCH ON
ENSURE BOILER IS NOT IN PRE-HEAT MODE
DIVERTER VALVE (LET BY)
{ISOLATEMAINSPOWER}<
DHW FLOW ADJUSTER
{ISOLATEMAINSPOWER}
DHW MODULATION (GV3 NO VOLTAGE)
{ISOLATEMAINSPOWER}<
GAS VALVE 1 RESISTANCE
{ISOLATEMAINSPOWER}
GAS VALVE 1 VOLTAGE (PRE-HEAT)
CH/HW SWITCH IN HW P
AIR PRESSURE SENSING TUBES
{ISOLATEMAINSPOWER}
PILOT INJECTOR
{ISOLATEMAINSPOWER}
SPARK ELECTRODE
{ISOLATEMAINSPOWER}
DHW PRE-HEAT THERMOSTAT VOLTAGE (PRE-HEAT)
CH/HW SWITCH IN HW POSITION
ENSURE THAT THE BOILER IS COLD AND READY FOR PRE-HEAT
DHW OVERHEAT THERMOSTAT
{ISOLATEMAINSPOWER}
ENSURE THAT THE BOILER IS NOT AT ITS FULL OPERATING TEMPERATURE
PUMP VOLTAGE (PRE-HEAT)
{ISOLATEMAINSPOWER}<
PCB 26 MAINS SUPPLY (PRE-HEAT)
{ISOLATEMAINSPOWER}<
FAN IMPELLER
{ISOLATEMAINSPOWER}
AIR PRESSURE SWITCH: NO AIR RESISTANCE
{ISOLATEMAINSPOWER}
BOILER SWITCH ON VOLTAGE (PRE-HEAT)
CH/HW SWITCH IN HW P
AIR PRESSURE SENSING TUBES
{ISOLATEMAINSPOWER}
MAINS NEON I 2 (PRE-HEAT)
{ISOLATEMAINSPOWER}<
GAS VALVE 2 OPERATION (PRE-HEAT)
{ISOLATEMAINSPOWER}<
ROOM THERMOSTAT VOLTAGE
CH/HW SWITCH IN CH P
System Information
- Total Tests: 135
- Sequence Logic: Decoded from encrypted .seq file
- Navigation: Dynamic based on pass/fail results
- Source: 4731307 GW SWIFTFLOW 100 SIT Control