Set Appliance State:

Set Multimeter to AC Voltage Set meter to measure AC Volts
CH Demand
Isolate Mains Power to appliance as per TOPs P4
CH/HW Switch in CH position
Ensure boiler is not in Pre-Heat mode
Gain access to PCB (use insulation mat as required)
Ensure the base of PCB 27 is insulated and not in contact with the boiler

WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure mains voltage across the plug-on connector marked DIV L (brown) and DIV N (blue) on PCB 27.