Set Appliance State:
Mains Power Off
CH Demand
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Remove both the spaded white and blue wires from gas valve 2 solenoid, noting their positions and measure the resistance across the solenoid.
Resistance should be approximately 2 K ohms.
Replace wires after test.
Resistance should be approximately 2 K ohms.
Replace wires after test.

Isolate as per TOPs P4
and refit as necessary