Set Appliance State:

Set Multimeter to AC Voltage Set meter to measure AC Volts
Isolate Mains Power to appliance as per TOPs P4
CH/HW switch in HW position
Boiler switch in Off position
Ensure that the boiler is cold and ready for Pre-heating
Gain access to PCB (use insulation mat as required)
Ensure connections on base of PCB 27 do NOT come into contact with boiler as shorting will occur
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure mains voltage across the blue and brown wires on the plug-on connector marked CON 4 Pump on PCB 27.