Set Appliance State:

Set Multimeter to AC Voltage Set meter to measure AC Volts
CH Demand
Isolate Mains Power to appliance as per TOPs P4
CH/HW switch in CH position
Boiler switch in On position
Ensure boiler not in Pre-Heat mode
Gain access to PCB (use insulation mat as required)
Ensure base of PCB 27 is insulated and not in contact boiler as shorting will occur
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the voltage across the connections on the connector
marked CON 2 gas valve 3 (violet wires) on PCB 27.