Set Appliance State:
Mains Power Off
Turn Hot Water Tap On
CH/HW switch in HW position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Is the flow rate and temperature rise satisfactory?
Flow rate should be 9.6 L/min (2.1 G/min) at 35 deg C temperature rise.
Flow rate should be 9.6 L/min (2.1 G/min) at 35 deg C temperature rise.