Set Appliance State:
Gas Off
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Remove the top two screws of the combustion chamber and slacken the lower two screws 2-3 turns to allow viewing of the spark electrodes as shown
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset appliance if necessary.
Allow boiler to commence its ignition sequence.
Can a strong, consistent spark be observed at the electrodes for approximately 4 seconds?
Use of a mirror may aid observation if access to the boiler is poor.
Note:
Design of electrodes may differ to that shown depending on boiler serial number, but the test remains the same.
Sparking present
Sparking absent
Allow boiler to commence its ignition sequence.
Can a strong, consistent spark be observed at the electrodes for approximately 4 seconds?
Use of a mirror may aid observation if access to the boiler is poor.
Note:
Design of electrodes may differ to that shown depending on boiler serial number, but the test remains the same.
Sparking present
Sparking absent