Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset boiler if required.
Allow ignition sequence to commence.
Measure the voltage at connector CN1 connection 8 (brown wire) on the ignition PCB to a suitable neutral.
Approximately 8 seconds after the fan starts mains voltage should be present for 3 to 5 seconds. This should repeat 5 times before boiler locks out, with approximately 5 seconds between attempts.