Set Appliance State:
Mains Power Off
CH Demand
External controls calling for CH
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage at terminal 11, marked SL (red lead) and terminal 10, marked N (blue lead) at the terminal block.
Note:
If no external controls are fitted ensure there is a link between terminal 9 (marked L) and terminal 11 (marked SL).
Note:
If no external controls are fitted ensure there is a link between terminal 9 (marked L) and terminal 11 (marked SL).

Isolate as per TOPs P4
and refit as necessary