Set Appliance State:
Mains Power Off
Gas Off
CH Demand
Air heater switch set to constant
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across connection 11 (brown lead) and connection 12 (blue lead) on the control module.

Isolate as per TOPs P4
and refit as necessary