Set Appliance State:
Mains Power Off
Gas Off
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage at the connection marked L (brown lead) and connection marked N (blue lead) on the main terminal block located on the back of the electrical door assembly.

Isolate as per TOPs P4
and refit as necessary