Observation:
Test 1 - Central heating.
Gas Off
CH Demand
Mains Power On
Air heater switch set to constant.
Allow the ignition sequence to commence.
Does the combustion fan run for longer than
30 seconds?
Remove CH demand.
Air heater switch set to Off.
Gas Off
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Air heater switch set to constant.
Allow the ignition sequence to commence.
Does the combustion fan run for longer than
30 seconds?
Remove CH demand.
Air heater switch set to Off.