Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to the boilers main terminal strip
Ensure no demand for CH
Ensure no demand for CH
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between the 2nd terminal from the left under "ROOM STAT / TIMER" to the "MAINS IN" N connection at the mains terminal strip.
With no demand mains voltage should be absent.
With no demand mains voltage should be absent.

Isolate as per TOPs P4
and refit as necessary