Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
Slightly move spark generators top connector to expose terminal
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

If required, reset boiler, press mode and ok for 2 seconds.
Allow self-check to complete and ignition sequence to commence.
Measure for DC voltage across the top terminal (spark generator) and a suitable earth connection.