Set Appliance State:
Mains Power Off
CH Demand
Central Heating Switch in constant position
Boiler Switch in ON position
Boiler Switch in ON position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is mains voltage present between connector PL3 connection 3
(red wire) and connector PL1 neutral connection 8 (blue wire)?
Note:
Boiler may go to lockout.
Switch OFF mains power and press reset button to cancel lockout.
(red wire) and connector PL1 neutral connection 8 (blue wire)?
Note:
Boiler may go to lockout.
Switch OFF mains power and press reset button to cancel lockout.

Isolate as per TOPs P4
and refit as necessary