Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Boiler Switch in ON position
Central Heating switch in Constant position
Central Heating switch in Constant position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is there mains voltage between L and N terminals on water pump connector?
Note:
Boiler may go to lockout, switch OFF power and press reset switch to cancel lockout.
Note:
Boiler may go to lockout, switch OFF power and press reset switch to cancel lockout.

Isolate as per TOPs P4
and refit as necessary