Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Gain access to PCB (use Insulation Mat as required)
Central Heating Switch in Constant position
Room thermostat calling for heat (if fitted)
Note:
If no external room thermostat is fitted a link between terminals 3 & 4 (L & Swl) of the mains power supply terminal block should be fitted
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Is there mains voltage present on connector PL1 connection 3 (white wire) and connection
8 neutral (blue wire)?