Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB (use Insulation Mat as required)
Boiler Switch in Standby position
Central Heating switch in OFF (central) position
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Turn on hot water tap and observe DHW demand LED on modulation control board.