Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Boiler Switch in ON position
Central Heating switch in OFF (central) position
Boiler Switch in ON position
Central Heating switch in OFF (central) position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is there mains voltage present across connector PL3 connection 3 (red) and connector PL1 connection 8 (blue)?

Isolate as per TOPs P4
and refit as necessary