Set Appliance State:
Mains Power Off
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Boiler On
Boiler On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between D23 (Red wire) and D24 (Red wire).
The fan is receiving power if mains voltage is present.
The fan is receiving power if mains voltage is present.

Isolate as per TOPs P4
and refit as necessary