Set Appliance State:
NO demands
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Check the system pressure is 1 - 1.5bar (when cold).
Allow a small amount of water into the system via the filling loop and check that the gauge responds to the increase in pressure.
Check that there is no air in the boiler and system.
Note:
1. System pressure should be set between 1.0 and 1.5 bar.
2. It is also advisable to check the auto air vent on the pump hydroblock.
Allow a small amount of water into the system via the filling loop and check that the gauge responds to the increase in pressure.
Check that there is no air in the boiler and system.
Note:
1. System pressure should be set between 1.0 and 1.5 bar.
2. It is also advisable to check the auto air vent on the pump hydroblock.