Set Appliance State:
Mains Power Off
DHW Demand
Turn on boiler and allow fan to run
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Test for voltage between the red wire on connector X15 on the PCB and neutral (blue)
There should be 15vdc.
There should be 15vdc.

Isolate as per TOPs P4
and refit as necessary