Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Disconnect connector M6 from the PCB
Disconnect connector M6 from the PCB
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Does the boiler still fire with no demand?
Isolate as per TOPs P4
and refit as necessary