Set Appliance State:
Mains Power Off
Gas Off
Remove control box cover
Remove and MAKE SAFE one wire from the M5 - Timer terminal
Remove and MAKE SAFE one wire from the M5 - Timer terminal
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
NOTE: If no time controls are fitted there must be a link fitted between the two "Timer" terminals of M5, if this is the case for this test remove one side of the link.
Measure DC voltage across the terminals of M5 marked Timer on the PCB.
Expect approx. 24Vdc across the terminals.
Reconnect the wire after testing.
Measure DC voltage across the terminals of M5 marked Timer on the PCB.
Expect approx. 24Vdc across the terminals.
Reconnect the wire after testing.

Isolate as per TOPs P4
and refit as necessary