XSol Diagnostic System
Home
← Back
GV OPERATOR SOLENOID RESISTANCE
Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance
Remove one wire from Operator Solenoid.
Measurement:
Check resistance of Operator Solenoid is approx 5.5 kOhms.
MEASUREMENT AS ABOVE
MEASUREMENT NOT AS ABOVE
After test don't forget
Isolate as per TOPs P4
and refit as necessary
Isolate as per TOPs P4
and refit as necessary