Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove the electrode assembly from the boiler
Measurement:
Inspect the spark and detection electrodes, they should be clean and the ceramics should be free of any damage or cracks.
Make sure the gap between the spark electrodes is approximately 4mm.
Check for continuity (zero resistance) between the ends of each of the electrodes.
Make sure the gap between the spark electrodes is approximately 4mm.
Check for continuity (zero resistance) between the ends of each of the electrodes.

Isolate as per TOPs P4
and refit as necessary