Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Preheat OFF
Gain access to PCB (use insulation mat as required)
Gain access to PCB (use insulation mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure AC voltage across the brown (L) and blue (N) wires if the boiler main terminal strip.
Expect mains voltage.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary