Set Appliance State:
Mains Power Off
CH Demand
CH temperature control set to MAX
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Preheat switched OFF (ECO button illuminated) A.S.A.P after power reinstated.
Allow the boiler to run until system starts to warm, then remove CH demand.
Does the pump continue to run for approximately 3 minutes?
Allow the boiler to run until system starts to warm, then remove CH demand.
Does the pump continue to run for approximately 3 minutes?
Isolate as per TOPs P4
and refit as necessary