Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB (use Insulation Mat as required)

Observation:

Does the boiler have external controls fitted?
This can be checked at the boiler by observing
whether a link is fitted between either of the
"Ls" to the "LR" at the terminal block ST2.