Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Attach a U-gauge to the gas valve burner pressure test point
Selector switch to CH - MAX position
All radiators turned ON
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow boiler to ignite, burner pressure to ramp up and start to heat system.
Turn off some of the radiators to reduce heating load.
Does the burner pressure reduce as the heating demand is met?
Notes:
1. The appliance is of a fully modulating design.
2. If the heating demand is satisfied at minimum gas rate then the burner pressure will not ramp up and
modulation will not take place.
3. When U-gauge is removed pressure test point should be tightened & checked for gas soundness.