Set Appliance State:

Mains Power Off
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
Set DHW flow rate at tap to approximately 5 l/min
and allow DHW to run cold
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow boiler to ignite.
Monitor the voltage across the terminals of the modulating solenoid (blue wires).
Does the voltage reduce as the DHW temperature demand is met?