Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Heating temperature selector to maximum
Hot water temperature selector to OFF
Gas On; Pilot On
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Observation:

Allow boiler to fire for a minimum of 1 minute and start to heat CH system.
Remove heating demand.
Does the pump continue to run to dissipate the heat from the boiler?
Note:
Pump overrun is approximately 3 minutes.