Set Appliance State:
Turn Hot Water Tap On
Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB (use insulation mat as required)
Gain access to PCB (use insulation mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is there mains voltage present on CN3 connections PL (brown) and PN (blue) on the sequence PCB?

Isolate as per TOPs P4
and refit as necessary