Set Appliance State:
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Operating Switch in Heating & Water position
Gain access to PCB (use insulation mat as required)
Operating Switch in Heating & Water position
Gain access to PCB (use insulation mat as required)
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is there Mains Voltage present across connector CN4 connection ML (Black) on Ignition Control board and connector X7 connection 2 (N Blue) on Main Driver board?
Note:
Voltage will not be present before main burner ignites.
Note:
Voltage will not be present before main burner ignites.

Isolate as per TOPs P4
and refit as necessary