Set Appliance State:
Mains Power Off
CH Demand
Operating Switch in Heating & Water position.
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Check the lever located on the underside of the Diverter Valve has travelled upwards, to its Open (CH) position.