Set Appliance State:
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow burner to ignite and appliance to run with a CH demand for 1 minute.
Remove the CH demand.
Monitor the pump and fan after the demand has ceased.
The pump should overrun for approximately 15 minutes.
The fan should overrun for approximately 30 seconds.
Do the over runs behave as described above ?
Note:
These settings are adjustable in the appliance transparent parameters.
If the appliance does not behave as described above, it is advisable to check Parameter P05 and P24.
Click HERE for guidance on how to access the transparent parameters
Alternatively refer to Adapt for guidance.
Remove the CH demand.
Monitor the pump and fan after the demand has ceased.
The pump should overrun for approximately 15 minutes.
The fan should overrun for approximately 30 seconds.
Do the over runs behave as described above ?
Note:
These settings are adjustable in the appliance transparent parameters.
If the appliance does not behave as described above, it is advisable to check Parameter P05 and P24.
Click HERE for guidance on how to access the transparent parameters
Alternatively refer to Adapt for guidance.
Isolate as per TOPs P4
and refit as necessary