Set Appliance State:

Turn Hot Water Tap On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow burner to ignite and boiler to run with a DHW demand for 1 minute.
Turn hot water tap OFF.
Monitor the pump and fan after the demand has ceased.
The pump should overrun for approximately 30 seconds.
The fan should overrun for approximately 90 seconds.
Do the over runs behave as described above?