Set Appliance State:
Gas Off
| Isolate Mains Power to appliance as per TOPs P4 |
Remove the air impulse tube from the air gas manifold
Connect a performance tester to the air gas manifold test point
(where the impulse tube was previously connected)
Connect a performance tester to the air gas manifold test point
(where the impulse tube was previously connected)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Measure the fan pressure during the fan and pump purge period.
Expect approximately 2.2mb.
Is the fan pressure as expected?
Expect approximately 2.2mb.
Is the fan pressure as expected?