Set Appliance State:
CH Demand
Boiler CH thermostat to MAX
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset appliance as necessary.
Allow the central heating system to reach full operating temperature.
Does the system pressure remain stable or does it rise excessively?
Allow the central heating system to reach full operating temperature.
Does the system pressure remain stable or does it rise excessively?