Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Remove connector X2 from PCB
Remove connector X2 from PCB
Measurement:
Test the resistance between the 2 orange wires (1 & 2).
Expected resistance closed circuit / zero resistance.
Expected resistance closed circuit / zero resistance.

Isolate as per TOPs P4
and refit as necessary