Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Remove connector from gas valve and make safe
Remove connector from gas valve and make safe
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Allow fan to run.
After approximately 3 seconds measure voltage between pins 3 and 4 (brown and blue) on connector X7 on the PCB.
Expected voltage approximately 240VAC.
Note:
Voltage will only be present for approximately 3 seconds during the sparking stage of the ignition cycle, if appliance locks out during testing reset as necessary until the test is complete.
After approximately 3 seconds measure voltage between pins 3 and 4 (brown and blue) on connector X7 on the PCB.
Expected voltage approximately 240VAC.
Note:
Voltage will only be present for approximately 3 seconds during the sparking stage of the ignition cycle, if appliance locks out during testing reset as necessary until the test is complete.

Isolate as per TOPs P4
and refit as necessary