Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
DHW Demand
Gain access to PCB (use Insulation Mat as required)
Connector X4 is located on left hand side of PCB
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

With boiler and fan running test voltage between White wire (3) on connection X4 and the neutral (blue) on connection X1.
Expect approx 30vdc when fan runs and pressure switch makes.
Keep testing on white wire while HW starts to warm up and continue to test for a suitable length of time to prove pressure switch is operating continuously (i.e. HW going hot and cold 2 times or more, or burner going off and back on twice)