Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Selector Switch in HOT WATER position
Selector Switch in HOT WATER position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Allow the Fan to operate and measure the voltage across PCB connection 66 on connector R (Blue wire, air pressure switch connection N/O) on the PCB to a suitable earth point.

Isolate as per TOPs P4
and refit as necessary