Adjust, Service, Repair or Replace as necessary
Isolate Water and Gas as appropriate
Location:
The appliance has reset and/or operated correctly after a fault code or other issue was present, ensure all air is removed from boiler/system, no internal water leaks are present, correct system pressure, CH system is balanced correctly and all PCB connectors are correctly fitted, retest appliance recommended CLICK HERE
| Isolate Mains Power to appliance as per TOPs P4 |
Location:
Upon completion of the fault diagnostics carry out final electrical safety tests and checks as per TOPs (C6).
Refer to ADAPT for further information.
Please leave Feedback about this diagnosis via:
XSOL FEEDBACK FORM
Phone - 722429
or Email - Diaglab@britishgas.co.uk