Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
CH temperature control set to MAX
Attach pressure gauge to gas valve pressure outlet test point
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the boiler to ignite and run on central heating operation.
Confirm CH heating output is set correctly for the requirements of the CH system as per table opposite (see notes 1 & 2)?
Note:
1. The S24/S30 Compact is factory set to give a maximum c/heating output of 24 KW for S24 Compact and 30KW for S30 Compact.
2. It may take approximately 60 seconds for the burner pressure to reach maximum.
3. When pressure gauge is removed the pressure test point should be tightened and checked for gas tightness.