Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove connector X12 from the PCB
Remove electrical connections on the pump assembly
Remove electrical connections on the pump assembly
Measurement:
Test 1. Measure for resistance across pins 17 (blue) and 16 (brown)
of connector X12.
Expected resistance approximately 1 Mohm or greater.
Test 2. Measure for resistance across pin 16 (brown) and a suitable earth connection.
Expected resistance greater than 1Mohm.
of connector X12.
Expected resistance approximately 1 Mohm or greater.
Test 2. Measure for resistance across pin 16 (brown) and a suitable earth connection.
Expected resistance greater than 1Mohm.

Isolate as per TOPs P4
and refit as necessary