Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance if required (press reset button for 2 seconds and release).
Allow burner to ignite and establish.
After 1 minute turn OFF boiler at the ON/OFF selector switch.
Measure for mains voltage across pin 6 (black) CN302 and a suitable earth connection.
Allow burner to ignite and establish.
After 1 minute turn OFF boiler at the ON/OFF selector switch.
Measure for mains voltage across pin 6 (black) CN302 and a suitable earth connection.

Isolate as per TOPs P4
and refit as necessary